Hello Zeljko,
Quote:
|
iptables -t nat -s 10.7.0.0/24 -A POSTROUTING -j SNAT --to 78.129.***.**
|
Is the correct one.
Quote:
if I wanted to move to Virtuozzo 4 node would I need to setup the server again?
how long is the down time?
|
We will setup a new VPS with new IP address on the Virtuozzo 4 Hardware node and provide you the details for the same. You can then make your installation again on the new vps server as per your requirement and make the necessary DNS changes as per your convenience. Once everything starts working from the new VPS server, we will stop your old VPS.
Or
If your VPS is not having any script which is integrated with the IP address, then we can move your whole VPS as it is to a new node and add new IP address to it. In this process you will not have to move any data or configure any thing again on your new VPS, you will only need to make the DNS changes for your site pointing to new IP address.
Please let us know if you want us to proceed with the setup of new VPS.